Home / Health / Mouldy Walls Plague £438M Aberdeen Hospital Project, Delays Mount
Mouldy Walls Plague £438M Aberdeen Hospital Project, Delays Mount
8 Jun
Summary
- Project cost surged from £134m to £438.6m.
- Opening dates pushed back to December and September next year.
- Mould found in wall panels, causing significant construction issues.

The Baird Family Hospital and Anchor Cancer Centre project in Aberdeen, initially planned for a 2020 launch, is experiencing significant delays and cost overruns. The projected budget has dramatically increased from an estimated £134m to £438.6m.
Previously scheduled to open this July, the Anchor Centre's opening has been pushed to December, with a potential risk of extending into early 2027. The Baird Family Hospital, originally set to receive patients in June of next year, is now expected to open in September of next year, though further delays are possible for both facilities.
Building work, which began in 2021 on the Foresterhill campus, has been plagued by technical challenges. These include problems with ventilation and water systems, as well as design flaws. Notably, mould was discovered in wall panels and insulation earlier this year, requiring their removal after construction materials became wet, raising infection control concerns.
The project director's report highlights the complexity and challenges faced, including a recent decision to add a secondary sterilization unit to enhance the water system, contributing to the Anchor Centre's delay. The report stresses that resolving technical, assurance, and commercial matters is critical for delivery, emphasizing the project's importance for improving patient care, experience, and safety.