Home / Environment / Shands Bridge Construction: Expect Delays

Shands Bridge Construction: Expect Delays

Summary

  • Massive bridge beams, 86-114 feet long, are being delivered daily.
  • Traffic near State Road 13 will face brief 5-15 minute stoppages.
  • Deliveries are expected between 1:00 PM and 2:00 PM daily.

Construction crews will be delivering massive bridge beams for the Shands Bridge project this week, potentially causing brief afternoon traffic delays. From Monday through Friday, beams ranging from 86 to 114 feet in length will be transported from Tampa for the construction of the next three spans.

To facilitate the safe arrival of these oversized trucks, traffic near the State Road 13 intersection will be temporarily halted. These stoppages are estimated to last between 5 to 15 minutes, allowing the trucks to navigate a difficult turn. Deliveries are expected to occur daily between 1:00 PM and 2:00 PM.

While the existing bridge will remain open, drivers with time-sensitive afternoon plans are advised to seek alternate routes or allow an extra 15 to 30 minutes for their commute. Officials apologize for the inconvenience, noting these disruptions are necessary for the long-term benefits of the new bridge structure.

Disclaimer: This story has been auto-aggregated and auto-summarised by a computer program. This story has not been edited or created by the Feedzop team.

Read more news on

Property Code: 5571