Home / Environment / Carbon Capture Struggles: Europe's Ambitious Projects Stall

Carbon Capture Struggles: Europe's Ambitious Projects Stall

Summary

  • New CCUS project announcements in Europe have sharply declined.
  • Heidelberg Materials paused a GeZero project due to value chain issues.
  • Yara's Sluiskil project highlights cross-border transport challenges.

Carbon capture, utilisation, and storage (CCUS) faces a challenging path in industrial decarbonisation. While theoretically offering a solution to cut emissions from heavy industry without costly new technologies, many projects have struggled with economics. Announcements for new CCUS projects in Europe have dropped significantly in the past three years, with cancelled capacity exceeding that of projects reaching final investment decisions.

Heidelberg Materials recently halted its GeZero project in Germany, a significant CCUS initiative. The company cited underdeveloped value chains for CO2 transport and storage as undermining the project's business case. Despite this setback, Heidelberg Materials indicated the project might proceed in the future under more favorable economic and regulatory conditions.

Despite widespread difficulties, some large-scale CCUS facilities are becoming operational. In September 2026, Yara International launched Europe's largest carbon capture facility at its fertiliser plant in Sluiskil, Netherlands. This facility aims to capture up to 800,000 metric tons of CO2 annually from ammonia production. The captured CO2 is transported to the Northern Lights storage facility off Norway's coast.

Transporting captured CO2 across borders presents complex logistical and regulatory challenges, as CO2 is classified as waste. The Dutch and Norwegian governments successfully navigated these barriers for the Sluiskil project, establishing a precedent for international cooperation on CCUS infrastructure. Similarly, Ineos launched Project Greensand in Denmark, the EU's first fully operational offshore carbon storage site.

The economic feasibility of CCUS remains a primary concern. Current costs for capture, transport, and storage typically range from 100 to 250 euros per ton. For CCUS to be viable without subsidies, either capture costs must decrease significantly, or carbon prices must rise substantially beyond the current EU Emissions Trading System (ETS) levels of approximately 88 euros per ton.

Governments play a critical role through subsidies and carbon pricing mechanisms like the EU ETS. However, the long-term commitment to subsidizing CCUS is uncertain, with some governments scaling back support. The EU's decision to slow emission cap reductions and extend free carbon permits has drawn criticism for potentially favoring polluters over decarbonisation efforts.

Ultimately, the future of CCUS hinges on a confluence of climate, financial, and economic factors. While industries await an economic inflection point, preparatory work is underway. However, a lack of long-term visibility and stability in policy and economic incentives raises doubts about the widespread development of future CCUS projects in Europe.

Disclaimer: This story has been auto-aggregated and auto-summarised by a computer program. This story has not been edited or created by the Feedzop team.

Read more news on

Property Code: 5571