feedzop-word-mark-logo
searchLogin
Feedzop
homeFor YouUnited StatesUnited States
You
bookmarksYour BookmarkshashtagYour Topics
Trending
trending

Powerball winning numbers announced

trending

FAA reduces airport traffic

trending

Marshawn Kneeland dead at 24

trending

Sabalenka defeats Coco Gauff

trending

Abby Zwerner wins $10M

trending

Tesla shareholders vote on Musk

trending

Dow mixed amid tech selloff

trending

Antonio Brown in custody

trending

GTA VI delayed to 2026

Terms of UsePrivacy PolicyAboutJobsPartner With Us

© 2025 Advergame Technologies Pvt. Ltd. ("ATPL"). Gamezop ® & Quizzop ® are registered trademarks of ATPL.

Gamezop is a plug-and-play gaming platform that any app or website can integrate to bring casual gaming for its users. Gamezop also operates Quizzop, a quizzing platform, that digital products can add as a trivia section.

Over 5,000 products from more than 70 countries have integrated Gamezop and Quizzop. These include Amazon, Samsung Internet, Snap, Tata Play, AccuWeather, Paytm, Gulf News, and Branch.

Games and trivia increase user engagement significantly within all kinds of apps and websites, besides opening a new stream of advertising revenue. Gamezop and Quizzop take 30 minutes to integrate and can be used for free: both by the products integrating them and end users

Increase ad revenue and engagement on your app / website with games, quizzes, astrology, and cricket content. Visit: business.gamezop.com

Property Code: 5571

Home / Environment / Bidadi Waste-to-Energy Plant Accused of Toxic Waste Mismanagement

Bidadi Waste-to-Energy Plant Accused of Toxic Waste Mismanagement

6 Nov

•

Summary

  • CPCB report finds Bidadi WTE plant failed to monitor toxic pollutants
  • Plant operator lacks authorization under Solid Waste Management Rules
  • Leachate released without proper monitoring, ash dumped in landfills
Bidadi Waste-to-Energy Plant Accused of Toxic Waste Mismanagement

According to a report submitted by the Central Pollution Control Board (CPCB) to the National Green Tribunal in November 2025, the Bidadi Waste-to-Energy (WTE) incineration plant in Bengaluru has been plagued by a series of environmental violations and operational failures.

The CPCB's investigation found that the plant, a joint venture between the Karnataka Power Corporation Limited (KPCL) and the Greater Bengaluru Authority (GBA), has failed to properly monitor and test for toxic and carcinogenic pollutants like dioxins and furans. Additionally, the plant operator has not obtained the necessary authorization under the Solid Waste Management Rules, 2016.

Other key issues highlighted in the report include the plant's online monitoring system not being connected to the state or central pollution control boards, and the release of leachate (liquid waste) without proper monitoring and testing. The report also revealed that the plant's bottom and fly ash, known to contain hazardous toxins and heavy metals, have not been adequately tested, with around 200 tonnes per day being openly dumped into landfills.

The Bidadi WTE plant, which was established with a loan of USD 13 million from the Japan Bank for International Cooperation (JBIC) and technology from the Japanese firm Hitachi Zosen, was built to operate on dry waste. However, the report found that the waste processed at the facility has over 40% moisture content, indicating that it is burning mixed, unsegregated municipal solid waste.

The findings have prompted calls from environmental groups like FridaysForFuture-Karnataka for the state government to immediately halt incineration-based waste management projects like the Bidadi plant, which they describe as a "textbook example of a false climate solution."

Disclaimer: This story has been auto-aggregated and auto-summarised by a computer program. This story has not been edited or created by the Feedzop team.
The Bidadi WTE plant has failed to monitor toxic pollutants like dioxins and furans, lacks authorization under Solid Waste Management Rules, and has mishandled leachate and ash disposal.
The Bidadi WTE plant was established with a loan of USD 13 million from the Japan Bank for International Cooperation (JBIC) and technology from the Japanese firm Hitachi Zosen.
The Bidadi WTE plant has been operating in violation of environmental regulations, burning mixed waste despite being designed for dry waste, and dumping hazardous ash into landfills.

Read more news on

Environmentside-arrowCentral Pollution Control Boardside-arrowNational Green Tribunalside-arrow

Advertisement

Advertisement

Advertisement

You may also like

Karnataka Pollution Board Celebrates 50 Years, Calls for Eco-Friendly Action

1 day ago • 7 reads

article image

Karnataka Power Project Faces Protests, Officials Defend Minimized Forest Impact

27 Oct • 34 reads

article image

Kerala Dissolves Waste Management Oversight Committee Amid Institutional Reforms

22 Oct • 57 reads

article image

Karnataka Unveils ₹100-Crore Afforestation Plan to Combat Ecological Challenges

18 Oct • 63 reads

article image

Tribunal Slams Deficient Responses on Markanda River Pollution

16 Oct • 79 reads

article image