feedzop-word-mark-logo
searchLogin
Feedzop
homeFor YouUnited StatesUnited States
You
bookmarksYour BookmarkshashtagYour Topics
Trending
Terms of UsePrivacy PolicyAboutJobsPartner With Us

© 2026 Advergame Technologies Pvt. Ltd. ("ATPL"). Gamezop ® & Quizzop ® are registered trademarks of ATPL.

Gamezop is a plug-and-play gaming platform that any app or website can integrate to bring casual gaming for its users. Gamezop also operates Quizzop, a quizzing platform, that digital products can add as a trivia section.

Over 5,000 products from more than 70 countries have integrated Gamezop and Quizzop. These include Amazon, Samsung Internet, Snap, Tata Play, AccuWeather, Paytm, Gulf News, and Branch.

Games and trivia increase user engagement significantly within all kinds of apps and websites, besides opening a new stream of advertising revenue. Gamezop and Quizzop take 30 minutes to integrate and can be used for free: both by the products integrating them and end users

Increase ad revenue and engagement on your app / website with games, quizzes, astrology, and cricket content. Visit: business.gamezop.com

Property Code: 5571

Home / Environment / Bandhwari Landfill Gets Scientific Overhaul

Bandhwari Landfill Gets Scientific Overhaul

8 Feb

•

Summary

  • Legacy waste at Bandhwari landfill to be processed by February 2027.
  • Strict action ordered against encroachments on natural drainage channels.
  • Occupancy certificates to be cancelled for failed rainwater harvesting.
Bandhwari Landfill Gets Scientific Overhaul

Authorities are accelerating environmental and infrastructure projects, focusing on the Bandhwari landfill site where 1.68 million metric tonnes of legacy waste will be processed scientifically by February 2027. A legal dispute concerning the site is currently under arbitration, with a hearing scheduled for February 16, 2026. Groundwater levels and environmental impacts in the Bandhwari area are being closely monitored.

To combat urban flooding, strict enforcement against encroachments on natural drainage channels and water exit routes is mandated. A detailed survey to identify obstructions is to be submitted within one month, followed by decisive action. Furthermore, 175 new rainwater harvesting recharge units will be constructed before the monsoon, and occupancy certificates for non-compliant societies face cancellation.

Efforts to curb water pollution include penalizing builders and industrial units discharging untreated wastewater. The Rao Birender Singh Sports Stadium construction in Wazirabad is slated for completion by January 2027. Additionally, a new underground pipeline project will significantly boost Gurugram's water supply capacity.

trending

Man City defeats Liverpool

trending

Yildiz extends Juventus contract

trending

Juventus vs Lazio: Key Battles

trending

Everton beat AFC Bournemouth

trending

Leverkusen draw stops winning streak

trending

Real Madrid vs Valencia live

trending

PSG vs Marseille live stream

Disclaimer: This story has been auto-aggregated and auto-summarised by a computer program. This story has not been edited or created by the Feedzop team.
The legacy waste processing at Bandhwari landfill is scheduled to be completed by February 2027.
Strict action is ordered against encroachments on natural drainage channels, with a survey to identify obstructions and subsequent enforcement.
Occupancy certificates for large plot owners and housing societies that fail to install or maintain functional rainwater harvesting systems face cancellation.

Read more news on

Environmentside-arrow

You may also like

Land Sinking Faster Than Seas Rise: New Flood Threat

28 Jan • 64 reads

article image

Utah's Winter Warmer Than Ever: Snow Deficit Hits Hard

18 Jan • 89 reads

article image

Gurugram Chokes: Dust, Debris Plague City

18 Jan • 103 reads

article image

Pollution Fight: Delhi Targets 20% Air Quality Boost by 2026

13 Jan • 134 reads

article image

Backyard Birds Choking on Microplastics

24 Dec, 2025 • 244 reads

article image