feedzop-word-mark-logo
searchLogin
Feedzop
homeFor YouUnited StatesUnited States
You
bookmarksYour BookmarkshashtagYour Topics
Trending
Terms of UsePrivacy PolicyAboutJobsPartner With Us

© 2026 Advergame Technologies Pvt. Ltd. ("ATPL"). Gamezop ® & Quizzop ® are registered trademarks of ATPL.

Gamezop is a plug-and-play gaming platform that any app or website can integrate to bring casual gaming for its users. Gamezop also operates Quizzop, a quizzing platform, that digital products can add as a trivia section.

Over 5,000 products from more than 70 countries have integrated Gamezop and Quizzop. These include Amazon, Samsung Internet, Snap, Tata Play, AccuWeather, Paytm, Gulf News, and Branch.

Games and trivia increase user engagement significantly within all kinds of apps and websites, besides opening a new stream of advertising revenue. Gamezop and Quizzop take 30 minutes to integrate and can be used for free: both by the products integrating them and end users

Increase ad revenue and engagement on your app / website with games, quizzes, astrology, and cricket content. Visit: business.gamezop.com

Property Code: 5571

trending

Shots fired near CDC HQ

trending

Snow squalls disrupt London region

trending

Dembélé scores twice for PSG

trending

NEA: Electric coops receive loans

trending

Rocket Lab stock soars

trending

Girona defeats Espanyol in derby

trending

Micron invests $100B in NY

trending

Ed Oliver activated from IR

trending

Hoosiers head to championship game

Home / Business and Economy / East Coast Line Shut: 9 Days of Rail Disruption Ahead

East Coast Line Shut: 9 Days of Rail Disruption Ahead

17 Jan

•

Summary

  • East Coast rail line between London and Aberdeen faces a nine-day closure.
  • Electrification work necessitates the line's closure west of Edinburgh.
  • Overhead line installation requires bridge rebuilding and track adjustments.
East Coast Line Shut: 9 Days of Rail Disruption Ahead

The East Coast rail line, a vital corridor connecting London and Aberdeen, will experience a significant disruption for nine days, commencing Saturday, January 17, 2026. Network Rail has announced a complete closure of the line west of Edinburgh to facilitate crucial electrification work.

This extensive engineering effort is a key component of a £340 million project aimed at enhancing the line's environmental sustainability and service reliability. The work includes the rebuilding and raising of several bridges, alongside the lowering of tracks, to enable the installation of overhead electrical lines.

Passengers are strongly urged to seek alternative travel arrangements during this period. The work is scheduled to conclude on January 25, 2026, after which normal service is expected to resume, heralding an era of greener and more dependable rail travel for the region.

Disclaimer: This story has been auto-aggregated and auto-summarised by a computer program. This story has not been edited or created by the Feedzop team.
The East Coast rail line west of Edinburgh is closed from Saturday, January 17, 2026, until January 25, 2026.
The closure is for essential electrification work, including bridge rebuilding and track adjustments, as part of a £340m project.
The rail line between London and Aberdeen, specifically the section west of Edinburgh, is affected.

Read more news on

Business and Economyside-arrow

You may also like

SEPTA Tunnels Reopen: Commutes Restored!

12 Jan • 23 reads

article image

M6 Reopens Early After Speedy Bridge Swap

12 Jan • 25 reads

article image

Diesel Trains' Final Bow by 2026 in London

3 Jan • 67 reads

article image

Urgent warning: Landslide sensors may not work

19 Dec, 2025 • 120 reads

article image

UK Rail Timetable Shake-up: Biggest Change Since 2018

14 Dec, 2025 • 156 reads

article image