Home / Environment / Yonkers River Reborn After 90 Years Underground
Yonkers River Reborn After 90 Years Underground
28 Nov
Summary
- A river hidden for 90 years now supports aquatic life.
- Urban river restoration creates 13,775 sq ft of habitat.
- The project revitalized downtown Yonkers' landscape.
For nearly 90 years, the Saw Mill River flowed hidden beneath a parking lot in downtown Yonkers, New York. This buried section has now been "daylighted," bringing a vital aquatic ecosystem back to life. The restoration project has successfully created 13,775 square feet of aquatic habitat, including tidal and freshwater pools.
This initiative is a significant demonstration of urban river restoration's potential. The Saw Mill River, historically powering mills since the 1650s and central to Yonkers' industrial past, was covered in the 1920s to accommodate urban growth. The recent daylighting effort not only restored a natural water feature but also transformed an asphalt town square into Van der Donck Park, which opened in 2012.
The engineering challenges involved managing contaminated soil from the site's industrial past. Engineers utilized a temporary above-ground channel during construction and maintained a secondary concrete channel for high water flow. Since water began flowing in November 2011, the restored area has become a thriving habitat supporting various species like turtles, ducks, blue crabs, and eels.
Further sections of the river were uncovered in 2016 and 2018, expanding the daylighting initiative. Research, including a 2021 study on a similar project in Oslo, Norway, suggests that reopening buried streams facilitates the return of aquatic life. The Yonkers project showcases a paradigm shift, viewing urban rivers not as obstacles but as valuable community and environmental assets.