Home / Environment / Thames Crossing Work Begins: £10.6bn Project Underway
Thames Crossing Work Begins: £10.6bn Project Underway
22 Sep
Summary
- Early work on the Lower Thames Crossing project has commenced.
- The £10.6bn project includes tunnels under the River Thames.
- Environmental concerns clash with the project's green aims.
The initial stages of the significant Lower Thames Crossing project are now underway, with early preparation work visible in Kent and Essex. This 14.5-mile route, designed to connect Essex and Kent via twin tunnels beneath the River Thames, is planned to open to the public in the mid-2030s, following approval in 2025.
National Highways has heralded the £10.6bn development as the UK's most environmentally friendly large-scale construction. Preparations include the establishment of new wetlands and the construction of roads to support the extensive building operations. The tunnel boring phase is scheduled to commence in autumn 2028.
However, environmental advocacy groups have voiced strong objections. Concerns centre on the irreversible loss of ancient woodland in Kent and the potential for increased traffic congestion. Critics argue that the project represents a poor allocation of public funds and that greater emphasis should be placed on rail transport for freight.