Home / Disasters and Accidents / Nag River Wall Repair Urged Before Monsoon
Nag River Wall Repair Urged Before Monsoon
14 Jun
Summary
- Municipal commissioner ordered urgent completion of the Nag River retaining wall.
- The wall was damaged during the 2023 floods and needs reconstruction.
- Officials also reviewed flood prevention measures and encroachment removal.

Municipal Commissioner Vipin Itankar has issued a directive for the swift completion of the long-pending retaining wall along the Nag River near St Xavier's School in Pardi. This crucial pre-monsoon work aims to prevent potential flooding, as the wall was significantly damaged during the 2023 floods and has yet to be rebuilt.
The commissioner's order came during an inspection of the Nehru Nagar zone, where he reviewed flood prevention measures and development projects. Concerns about the river overflowing into residential areas were highlighted by local representatives, emphasizing the urgency of the retaining wall's reconstruction. This initiative also includes addressing traffic congestion and removing encroachments in other areas.
Further actions include an ongoing encroachment removal drive in the Nandanwan area, specifically along the stretch between Rajendra Chowk and Jagnade Chowk. Civic officials anticipate this will improve traffic flow and alleviate bottlenecks on a major commercial route. The focus remains on ensuring the city is prepared for the approaching monsoon season.