Home / Disasters and Accidents / Behala Gridlock: Flyover Closure Paralyses Kolkata Commute
Behala Gridlock: Flyover Closure Paralyses Kolkata Commute
16 Dec
Summary
- Commuters faced harrowing travel times due to the Taratala Flyover's load testing closure.
- Some commuters spent over 85 minutes for a short 3.5 km journey.
- An estimated 2 lakh vehicles used the diversion, causing significant traffic jams.

Residents of Behala and commuters from South 24 Parganas endured significant travel disruptions as the Taratala Flyover closed for essential load testing. The shutdown, which commenced on Saturday evening, was slated to continue until Tuesday midnight, causing widespread inconvenience.
The impact was severe, with a single 3.5 km stretch taking over 85 minutes for some travelers. The diversion of approximately 2 lakh vehicles onto a single lane led to traffic congestion that stretched for kilometers, affecting major roads and crossings throughout the Behala area.
Authorities advised commuters to use alternative routes, but these diversions also experienced slow movement. The gridlock affected daily commutes, causing missed meetings and prolonged journeys, drawing comparisons to past infrastructure-related incidents.




