Home / Business and Economy / NTPC Unit Powers Up in Gujarat
NTPC Unit Powers Up in Gujarat
10 Dec
Summary
- NTPC Green Energy begins commercial power supply from a 6.6 MW wind project.
- This capacity is part of a 100 MW hybrid project located in Bhuj, Gujarat.
- The addition increases NTPC's total installed capacity to 84,931 MW.

NTPC Green Energy Limited (NGEL) has initiated commercial power supply from a 6.6 MW wind component of its hybrid project in Bhuj, Gujarat. This marks a crucial operational milestone for the 100 MW hybrid facility, contributing to India's growing renewable energy infrastructure.
The newly commissioned capacity is part of a larger venture through Ayana Renewable Power Four Pvt Ltd, a subsidiary within NTPC's joint venture structure. This expansion boosts the current commercial capacity of the NGEL Group to 7,639.075 MW, with the total installed capacity now reaching 7,645.675 MW.
Overall, this development contributes to NTPC group's substantial energy generation capabilities, increasing its total installed capacity nationwide to 84,931 MW. The company continues to focus on integrating green energy solutions into its portfolio.



